Seven stages, in the order they happen.

  1. 01

    Brief

    What the building has to do, who for, and what it cannot cost more than. Written down and agreed before anything is drawn.

  2. 02

    Site and feasibility

    What the site allows, what the rules allow, and whether the brief fits inside both. This is where a project is saved or lost.

  3. 03

    Concept design

    The idea, in plan and section, at a size you can argue with. Two or three options, not one, so there is something to choose between.

  4. 04

    Design development

    The chosen option taken to real dimensions, real materials and real openings. Changes are still cheap here, and they stop being cheap next.

  5. 05

    Approvals

    The application, the consultants and the conditions. Timelines here belong to the authority, not to us, and we say so rather than guess.

  6. 06

    Construction drawings

    The set the building is priced and built from. One convention throughout, so a drawing made in month one reads against one made in month nine.

  7. 07

    On site

    Questions answered, work checked against the drawings, and decisions made when the two differ. The stage most often dropped.